27 November 2014 EXECUTIVE SUMMARYThe 4 "” liner Cementing operations was conducted and completed with no issues.
After the job was performed, the drill pipe string was pulled out 12 meters above the liner top
and the excess cement was circulated out of hole.
However when attempt to resume pulling out of whole, the pipe get stuck where several
attempt to pull out of hole was tried with no vain. Still circulation through the string is possible
(700 lpm @ 2400 - 2800 psi)
after pooh seeting tool +drill pipe the setting tool ; was found bonded with the cement and Wash out problem was observed at the drill string connection .
I need any explanation .
4 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
vam thread
Buoyancy Assisted Casing Equipment
10 3/4" Casing Coupling Clearance
Keeping People off Casing
External coating of surface casing