Challenges to take up 3 ½” Liner cementation in 4.5" HOLE SECTION.
18 December 2017Hi all
Taking up a Job to run & cement 3 1/2" Liner in 4 1/2" Hole section- Open hole @+/-2000ft. for 3 1/2" liner overlap on 5 1/2" Liner is 300ft.
Casing Configuration is 75/8"liner & Tieback to surface x 5 1/2" liner x 3 1/2" Liner.
7 5/8" Shoe - 10250ft
5 1/2" Liner top -9950ft-
5 1/2" Liner shoe @ 10750 ft.
3 1/2" Shoe @ 12700ft.
If anyone has done this kind of Liner running and cementation job, can you please share the challenges encountered.
If not what other options were considered.
Let me know if you need some more details about the Job .
Thanks
Hari
0 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
vam thread
Buoyancy Assisted Casing Equipment
10 3/4" Casing Coupling Clearance
Keeping People off Casing
External coating of surface casing