spot_img

Milling 4 1/2in production upwards with Coil Tubing

14 June 2023

To P&A a production well, is intended to Perf & Squeeze in the 4-½in tubing, to set a cement barrier plug inside and in the annulus outside the tubing (9-5/8in).

If setting the cement plug fails, the plan is to section mill the 4-½in tubing upwards to be able to set a mechanical barrier as an anchor for the cement plug in the 9-5/8in production casing (50 deg inclination).

Does anyone have any experience with this, from the point on milling tools, barries as anchor for the cement plug and procedures in general?

Thanks

0 Answer(s)

Support Spread

We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

donate

Posted by

Soren Hartmann

Soren Hartmann

Operation Optimisation, No Cure–No Pay, Performance Optimisation and Knowledge Management Specialist | Drilling Training | Facilitator | Senior Drilling Supervisor & Project Manager

Drillconsult

Discussions: 4

Replies: 16

Related Discussions

drillers.com rp2