Unsure of selecting a group for placing your discussion? Post it under the General discussions and we will do the needful.
GROUPS
GROUPS | LAST POST | DISCUSSIONS | RESPONSES |
---|---|---|---|
Well Control
1.Barrier Philosophy 2.Bullheading 3.Circulation Kill 4.Detection and Causes of Kicks 5.Relief Wells 6.Volumetric Kill 7.Well Bore Damage 8.Well Control Equipments 9.Well Control Methods 10.Well Integrity Issues |
Kick off pressure for 2 packer case | 91 | 473 |
Cementing
1.Cementing Equipment 2.Cements 3.Displacement 4.Plugback 5.Single Stage 6.Two Stage - Running & Cementing Casing & Liners Sub group(s)Remedial Cementing Test |
Coiled Tubing Cementing | 95 | 539 |
Casing & Liners
Matters relating specifically to casing and liners, including : centralisation, shoetracks, liner hangers, DV collars and so on. Includes wear-bushings and casing hangers Sub group(s)Drilling with casing Conductor Driving or Piling |
Casing Seat Selection | 106 | 461 |
Completion
1.Artificial Lift 2.Completion Equipments 3.Completion Fluids 4.Horizontal / ERD wells 5.Multi-Laterals 6.Multi-phase Flow 7.Perforating 8.Safety Issues 9.Sand control 10.Tubing Stress Sub group(s)ESPs Fracc'ing Ops DST SMART Completions |
Plugged Chemical Injection Line | 119 | 340 |
Drilling Operations
Sub group(s)Stuck-pipe Milling Sidetracking Hole Problems |
Water wells via air drilling | 168 | 857 |
General discussions
The default group for discussions where no groupings were exercised by the contributor. The Administrator may move such discussions to an appropriate group later on, periodically. |
PvElite v26 2024 - ISL License Price and other details | 230 | 505 |