Unsure of selecting a group for placing your discussion? Post it under the General discussions and we will do the needful.

GROUPS

GROUPS LAST POST DISCUSSIONS RESPONSES
Well Control
1.Barrier Philosophy 2.Bullheading 3.Circulation Kill 4.Detection and Causes of Kicks 5.Relief Wells 6.Volumetric Kill 7.Well Bore Damage 8.Well Control Equipments 9.Well Control Methods 10.Well Integrity Issues
Kick off pressure for 2 packer case 91 473
Cementing
1.Cementing Equipment 2.Cements 3.Displacement 4.Plugback 5.Single Stage 6.Two Stage - Running & Cementing Casing & Liners
Sub group(s)
Remedial Cementing Test
Coiled Tubing Cementing 95 539
Casing & Liners
Matters relating specifically to casing and liners, including : centralisation, shoetracks, liner hangers, DV collars and so on. Includes wear-bushings and casing hangers
Sub group(s)
Drilling with casing Conductor Driving or Piling
Casing Seat Selection 106 461
Completion
1.Artificial Lift 2.Completion Equipments 3.Completion Fluids 4.Horizontal / ERD wells 5.Multi-Laterals 6.Multi-phase Flow 7.Perforating 8.Safety Issues 9.Sand control 10.Tubing Stress
Sub group(s)
ESPs Fracc'ing Ops DST SMART Completions
Plugged Chemical Injection Line 119 340
Drilling Operations
Sub group(s)
Stuck-pipe Milling Sidetracking Hole Problems
Water wells via air drilling 168 857
General discussions
The default group for discussions where no groupings were exercised by the contributor. The Administrator may move such discussions to an appropriate group later on, periodically.
PvElite v26 2024 - ISL License Price and other details 230 505