Abandonment cement plugs in 4-1/2" liner
22 October 2012I am looking at setting abandonment cement plugs inside 4½ liner. Does anyone have experience of setting balanced cement plugs on 2⅞" drillpipe inside 4½ liner?
The well is vertical with a high mud weight (17.6 ppg) and planned cement density is 18.2 ppg. We have concerns with a lack of differential for U-Tubing and tight clearance of the tool joints inside the liner (3.7" ID).
Thanks
Kevin
11 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation