Hole packed off during 5" liner cementing job

19 August 2017 Dear Team
RIH 5" liner successfully to bottom, circulated and picked cementing head. Tried to resume circulation, observed hole packed-off.
RIH 5" liner successfully to bottom, circulated and picked cementing head. Resume circulation, 3 bottoms up, pumped 8 bbl spacer (Fly) didnot shutt off pumps, just switched to spacer. After pumping 8 bbl of spacer, hole packed-off as the spacer was in the string.

What would be best solution to get rid of it?

Regards
Jamil
0 Answer(s)