Hole packed off during 5" liner cementing job
19 August 2017 Dear TeamRIH 5" liner successfully to bottom, circulated and picked cementing head. Tried to resume circulation, observed hole packed-off.
RIH 5" liner successfully to bottom, circulated and picked cementing head. Resume circulation, 3 bottoms up, pumped 8 bbl spacer (Fly) didnot shutt off pumps, just switched to spacer. After pumping 8 bbl of spacer, hole packed-off as the spacer was in the string.
What would be best solution to get rid of it?
Regards
Jamil
0 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation