Cementing 9-5/8" csg with long rathole below

02 April 2009 I'm currently working on a Geothermal land well project in Denmark. The well will TD in 12-1/4" hole but there are two targets, Gassum and Bunter sands. Before committing to 9-5/8" liner they need to evaluate which sand will give the greatest PI for producing water. Once it is determined which formation to produce from the 9-5/8" will be set above the reservoir and a gravel packed sand screen completion run. As such there will be a minimum of a 300m rathole beneath the shoe. I have spoken to a few people and the general consensus seems to be to just go ahead and cement conventionally, perhaps spotted a hi-vis pill first.

Anyone have any experience in doing this.

Regards
Adrian Todd
4 Answer(s)

Support Spread

We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

donate