19 March 2026Dear members
I'd like to tap into any of your experience with a pump-and-pull operation; to set a P&A cement plug, using the existing completion whilst recovering it to surface.
Normally we set balanced cement plugs by running ‘fresh’ tubing (or suitable drillpipe) from surface or pump and pull with coiled-tubing.
In our case, we are investigating the feasibility of a pump-and-pull as we recover 4½” tubing from inside a 7” liner.
- Have you done this?
- What precautions did you take?
- How did it turn out?
- Any key lessons learnt?
- Any other comments?
Thanks and kind regards
Claudio
1 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Claudio Virgilio
SnrDrilling Engineer
Discussions: 5
Replies: 7
Related Discussions
Light Weight Cement for Structural Casing
Cementing 30" With No Vent Valve
Cementing through Tesco Casing Running Tool
Cement mule shoe
Displacing liner cement with water to suspend