spot_img

Multiple drilling then casing/cementing?

08 November 2005 I know from experience that operators have batched drilled as many as
3-4 conductor wellbores and then run and cemented consecutive
conductors strings. e.g Heidrun field in Norwegian Sea.

In this vain, has anyone had experience of consecutively 'batch
drilling' 17 1/2" or 26" surface wellbores and then running 2-3 20"
or 13 3/8" surface strings.

Thanks.
Peter Aird.
2 Answer(s)

Support Spread

We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

donate