Deepwater Drilling Joint Industry Project Event
03 June 2022A major deepwater well design deficiency is the shallow setting depth of the initial conductor casing which does not leverage the increase of fracture gradient below the seafloor. This JIP event will show the value of replacing jetting in initial conductor casing with casing drilling to deepen conductor casing setting depths creating a more favorable well geometry deeper in the well.
Below is the registration link to the JIP event (in-person and virtual).
https://www.subseadrive.com/joint-industry-project
Documents uploaded by user:
SubseaDriveCorp_Press Release_FINAL_4-28-22.docx
0 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
Cement excess to use when Drilling-with-Casing
Performance of Volant's Casing Running Tool (CRTi)
Drill Pipe backout from TD saver sub and twisted at the connection between HWDP FH and the rest of the BHA at about 5600 ft below
Best parameters to drilling out cement plugs
On what parameters the suitability of UBD over MPD to drill a well can be decided.