Deepwater Drilling Joint Industry Project Event

03 June 2022

A major deepwater well design deficiency is the shallow setting depth of the initial conductor casing which does not leverage the  increase of fracture gradient below the seafloor.  This JIP event will show the value of replacing jetting in initial conductor casing with casing drilling to deepen conductor casing setting depths creating a more favorable well geometry deeper in the well.  

Below is the registration link to the JIP event (in-person and virtual).