DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Shear Ram Configuration Gary Buyers Well Control 11 May 2021 5
Use of a Divertor in tophole off a jackup or platform Dave Taylor - SPREAD Moderator Well Control 11 May 2021 13
Early kick detection on a floating rig Andy Sooklal Well Control 11 May 2021 8
Kill a gas well after testing Cristian Mihalcea Well Control 11 May 2021 10
J-Flow Meter (strain gauge flow meter) Craig Fraser Well Control 11 May 2021 3
Pilot-hole off a jack-up (daylight hours only ?) Dave Taylor - SPREAD Moderator Well Control 11 May 2021 11
API STD 53 vs latest (previous edition) API RP 53 Valentin Tyulyakov Well Control 11 May 2021 8
Relief Well Planning Ian McIlwaine Well Control 11 May 2021 4
Well Control in H2S Environments Elman Mikayilov Well Control 11 May 2021 0
Running & inflating ECP in 'Significant Continual Loss' environment (Annulus Isolation) Dave Taylor - SPREAD Moderator Well Control 11 May 2021 4
Trapped pressure whilst testing BOP on stump Dave Taylor - SPREAD Moderator Well Control 11 May 2021 7
Stump testing BOPs on Jackups Thomas Emmons Well Control 11 May 2021 7
Well Control Equipment & Practices for infrequent wireline / slickline activities Dave Whitby Well Control 11 May 2021 0
Plunger vs. Flapper Float Valves Sam Yap Well Control 11 May 2021 7
Shearing expandable liner and inner running stirng. Peter Aird Well Control 11 May 2021 2
Kick with SICP Greater Than MAASP Elam Enoch Well Control 11 May 2021 11
Difference between 4-/16" 5000 psi valves of floor manifold and choke line Sidi Yahia Berrouigat Well Control 11 May 2021 3
Curious well control situation (using Water based KCL mud). Neil Fougere Well Control 11 May 2021 4
Stripper BOP for Well Service Sanny Suprihono Well Control 11 May 2021 0
Using Annular BOP for WL operations Askhat Burlibayev Well Control 11 May 2021 9