Unsure of selecting a group for placing your discussion? Post it under the General discussions and we will do the needful.
GROUPS
GROUPS | LAST POST | DISCUSSIONS | RESPONSES |
---|---|---|---|
Drilling Operations
Sub group(s)Stuck-pipe Milling Sidetracking Hole Problems |
Water wells via air drilling | 168 | 857 |
Cementing
1.Cementing Equipment 2.Cements 3.Displacement 4.Plugback 5.Single Stage 6.Two Stage - Running & Cementing Casing & Liners Sub group(s)Remedial Cementing Test |
Coiled Tubing Cementing | 95 | 539 |
General discussions
The default group for discussions where no groupings were exercised by the contributor. The Administrator may move such discussions to an appropriate group later on, periodically. |
PvElite v26 2024 - ISL License Price and other details | 230 | 505 |
Well Control
1.Barrier Philosophy 2.Bullheading 3.Circulation Kill 4.Detection and Causes of Kicks 5.Relief Wells 6.Volumetric Kill 7.Well Bore Damage 8.Well Control Equipments 9.Well Control Methods 10.Well Integrity Issues |
Kick off pressure for 2 packer case | 91 | 473 |
Casing & Liners
Matters relating specifically to casing and liners, including : centralisation, shoetracks, liner hangers, DV collars and so on. Includes wear-bushings and casing hangers Sub group(s)Drilling with casing Conductor Driving or Piling |
Forces calculation while cement 4" 1/2 liner | 107 | 465 |
Drill String Design
|
௵+2347036230889√ i want to join occult for money ritual in nigeria | 74 | 402 |
Completion
1.Artificial Lift 2.Completion Equipments 3.Completion Fluids 4.Horizontal / ERD wells 5.Multi-Laterals 6.Multi-phase Flow 7.Perforating 8.Safety Issues 9.Sand control 10.Tubing Stress Sub group(s)ESPs Fracc'ing Ops DST SMART Completions |
Plugged Chemical Injection Line | 119 | 340 |
Abandonments (facilities and/or wells)
Facilitate discussions on best practice for permanent facility and/or well abandonment. Sub group(s)P&A (Decommissioning) |
Characterizing Casing ID from Within Tubing | 71 | 330 |
Drilling & Completion
Sub group(s)Conventional Coring |
What is DWOP | 68 | 282 |
Drilling Fluids
1.Cementing and Zonal Isolation 2.Fluid Properties/Components 3.Formation damage 4.Selection/Design of mud 5.Solids control |
whatsapp@ +27 63 409 6205 bring back lost lover spells in new york city toronto sydney perth ottawa | 67 | 267 |
Drilling Equipment
Sub group(s)Down-hole vibration Hole-openers and under-reamers Bits and other Hole Making Tools |
Pneumatic Rubber Fenders and Offshore/Subsea Foam Floats | 74 | 260 |
Deepwater specific
Cover items specific to Deepwater activity |
Mud requirement & Barite requirement for Offshore drilling | 59 | 238 |
Data Acquisition
1.Coring Methods 2.FWFD Selection 3.Look Ahead Seismic 4.Permanent Monitoring 5.Subsurface Geophysics 6.Vert. Seismic Profile 7.Well Testing and Sampling 8.Wireline Logging Sub group(s)Pipe-conveyed Coring methods |
✓[[+2347036230889]]™ i want to join occult for money ritual in nigeria | 30 | 113 |
Rig Specific & Surveys
|
(Temporary and/or Low Cost) Heat Shields for Jack-up working alongside Wellhead Platform | 28 | 109 |
Performance
|
Definition of On-bottom/Off-bottom hours | 28 | 104 |
DWOP Comments
comments on DWOP Sub group(s)Best Practices Forum |
Use of an activate-able scraper in a drilling or cleanout BHA | 20 | 104 |
Training and Competency
Recommended training courses. Needing advice on course on a specific topic. |
Join Our Live Online Course: Sand Exclusion – Alternative Solutions | 28 | 89 |
Workover
|
Workover on1980 well not able to flow oil to surface due to damage during completion | 21 | 86 |
HTHP
To supplement the various HTHP Forums that exist .. by providing adhoc discussion service Sub group(s)HTHP Forum UK |
Subsea BOP use from a HDJU on an HPHT well | 17 | 85 |
Directional Surveying
To gather views and information on correcting the errors associated with current Directional Surveying practices. |
Stockhausen Effect | 16 | 75 |