Unsure of selecting a group for placing your discussion? Post it under the General discussions and we will do the needful.
GROUPS
GROUPS | LAST POST | DISCUSSIONS | RESPONSES |
---|---|---|---|
Waste Management
|
Drilling waste management software | 1 | 0 |
Well Control
1.Barrier Philosophy 2.Bullheading 3.Circulation Kill 4.Detection and Causes of Kicks 5.Relief Wells 6.Volumetric Kill 7.Well Bore Damage 8.Well Control Equipments 9.Well Control Methods 10.Well Integrity Issues |
Kick off pressure for 2 packer case | 91 | 473 |
Well Integrity
All aspects of well integrity other than cementing (see cementing Group) |
Calculating Cuttings Volumes/Weights | 11 | 42 |
Well Services
1.Coiled Tubing Tools 2.Rig Specification 3.Subsea Workover Sub group(s)Coiled tubing (Wellservices) |
oil and gas | 18 | 69 |
Well-testing
Identify best practice in well-testing .. |
Well test | 14 | 42 |
Workover
|
Workover on1980 well not able to flow oil to surface due to damage during completion | 21 | 86 |