Unsure of selecting a group for placing your discussion? Post it under the General discussions and we will do the needful.
GROUPS
GROUPS | LAST POST | DISCUSSIONS | RESPONSES |
---|---|---|---|
Coal Seam Gas
CSG-specific aspects |
0 | 0 | |
Jakarta Drilling Manager's Forum
To allow Drilling Managers in Jakarta to exchange information and store documents in an informal manner. |
BPMIGAS Operating Guidelines (PUPOP) | 1 | 0 |
Expandables
Promote discussion and knowledge sharing on expandables - incl. cement slurry design, use in HPHT wells etc., |
SET(Solid Expandable Tubular) in Ultra HPHT sections? | 1 | 1 |
Renewables
Discussions between professionals who are working in the renewable industries Sub group(s)Wind Solar Wave |
1 | 0 | |
Waste Management
|
Drilling waste management software | 1 | 0 |
Due Diligence
To cover the areas of Assurance; Readiness to Drill Risk Assessments; HAZIDs/HAZOPS etc., |
While drilling gas levels - what are your limits, how are they managed? | 4 | 5 |
Geo-thermal well specific
Discuss items of relevence to geo-thermal wells. General, industry-specific items should be entered into the "mainstream" groups. |
Swellable packer as a well barrier | 4 | 26 |
Platform maintenance issues
Safety issues. Stop/ Go cards. |
Hercules Deadline Anchor | 4 | 4 |
Recruitment
To allow rp-squared to earn revenue from this site, so we can keep it FREE to all members Sub group(s)UK North Sea |
Urgent need for a petroleum engineering job experience | 5 | 0 |
Logistics
Share best practice and understanding of logistics best practice |
National (Universal) Colour Code for Lifting Equipment | 5 | 28 |
Contracts & Procurement
|
Managing Supply Chain during Covid-19 Pandemic | 6 | 24 |
Rig Move
All aspect associated with rig-moves. Onshore: From start R/D, til ready to go operational; incl. transportation (land, sea, air) Offshore: From start pull anchors til anchors pre-tensioned and ready to operate; includes tow |
OEM Stacking | 7 | 20 |
Subsea Engineering and Systems
Sub group(s)Subsea Wellhead Systems Mudline Suspension Systems Mudline Drilling Templates Horizontal Subsea Trees Conventional Subsea Trees Tree on Mudline Deepwater Subsea Trees Subsea Manifolds ROV/ Tree interfaces |
NOV (Shaffer) Annulars | 8 | 32 |
Coal-Bed-Methane / Coal-Seam-Gas
Discuss the challenges associated with CBM/CSG. |
Well Bore Strengthening - Coal Seam Drilling | 9 | 4 |
Coiled Tubing Drilling
All aspect of coiled tubing |
Coiled Tubing Drilling surface setup | 10 | 6 |
Well Integrity
All aspects of well integrity other than cementing (see cementing Group) |
Removing a kick off cement plug to gain access to the well below the plug | 12 | 56 |
HSE
Health and safety Issues Sub group(s)Safety Training Safety Alerts DROPS COVID-19 Health Protocol |
Incident with BOP ram door - Public Incident Investigation Report | 13 | 26 |
Directional Surveying
To gather views and information on correcting the errors associated with current Directional Surveying practices. |
Stockhausen Effect | 16 | 75 |
Well-testing
Identify best practice in well-testing .. |
Eliminating the need for a Flex Trip (to check/clear tubing of debris) prior to (onshore) DST | 17 | 42 |
HTHP
To supplement the various HTHP Forums that exist .. by providing adhoc discussion service Sub group(s)HTHP Forum UK |
Subsea BOP use from a HDJU on an HPHT well | 17 | 85 |