DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
UPGRADE THE PRESSURE RATING FOR BRIDGE PLUGS BY SETTING TWO TANDEM BRIDGE PLUGS AND PRESSURE APPLIED AFTER SETTING FIRST ONE Marla Patrick Workover 11 May 2021 15
A difficult P&A Challenge Dave Taylor - SPREAD Moderator Abandonments (facilities and/or wells) 11 May 2021 15
Sidetracking in deep, hard, hot formations. Chris Henderson Well Control 11 May 2021 15
Jetting conductor with welded pads on the side Steve Devereux Casing & Liners 11 May 2021 15
Management of warebarge Dave Taylor - SPREAD Moderator Logistics 11 May 2021 15
Tensile rating of NPT threads Wei Chian Ong Cementing 11 May 2021 14
Does anyone have experience of using WBM or slick water during MPD operations? Alla Tag Drilling & Completion 26 October 2021 14
Minimum Cumulative Cement length requirement Andrew Sutcliffe Cementing 04 April 2022 14
Drilling equipment tender evalluation Yevhenii Khivrenko General discussions 11 May 2021 14
Extremely Abrasive formation & Losses Umair Ahmed Baig Drilling Operations 11 May 2021 14
Why does a Drill Pipe Safety Joint Work ? Dennis Tucker Drilling Equipment 11 May 2021 14
Cementing through Tesco Casing Running Tool Chris Schmickl Cementing 11 May 2021 14
MWD Survey Errors Chris Henderson Drilling & Completion 11 May 2021 13
Shallow testing MWD/FEWD strings Dave Taylor - SPREAD Moderator Drilling Operations 11 May 2021 13
Jetting to Nudge 16" Hole David Brecknock Drilling Operations 11 May 2021 13
PBL sub reliability Peter-Joern Palten Drill String Design 27 July 2021 13
Extreme Losses in Carbonate Huib Attema Drilling Fluids 11 May 2021 13
Use of a Divertor in tophole off a jackup or platform Dave Taylor - SPREAD Moderator Well Control 11 May 2021 13
Kick detection when drilling with floating mud cap Stian Ronnevik Deepwater specific 11 May 2021 13
Maximum RPM/WOB for UR -XR-800-8.5''x10-1/4'' Usama Sabir Drilling Operations 13 August 2023 13