DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
36" Conductor Hole BHA Mahesh Picha Drill String Design 11 May 2021 2
36″ Hole (Stab & X/Over) Iain MacLeod Drilling Operations 11 May 2021 2
36″ Underreamer Kevin Stilwell Drill String Design 11 May 2021 20
36in hole land (fixed rig) Peter Aird Drilling Operations 24 July 2021 2
37" HoleOpeners Tim Arnold Drilling Operations 11 May 2021 1
4-3/4" VAM EIS DC Askhat Burlibayev DST 11 May 2021 3
4.0" TIW valve Trung Chu Drilling Equipment 11 May 2021 3
5 7/8" dp .. VAM EIS and VAM Express Craig Castille Drill String Design 11 May 2021 2
5 items to gather before Investigating things that go wrong? Peter Aird Novice's questions 11 May 2021 2
5" G-105, XT-50 drill pipe Yasir Saeed Drill String Design 11 May 2021 5
5th 6th generation MODU 'warm/cold' stacking Peter Aird Rig Specific & Surveys 11 May 2021 1
6" hole drilling problems Chen Yuping Drilling Operations 11 May 2021 1
7 5/8" liner in 8 1/2" hole Drilling Operations 11 May 2021 0
7" liner cementing with very narrow pressure margin Noor Nordin Cementing 11 May 2021 8
7" Short Liner to cover loss zone Iskandar Teguh Wibowo Casing & Liners 30 October 2021 13
7″ Liner Cement Planning Ahmed Abdelhamid Cementing 11 May 2021 8
7″ liner dual cementing job - Deep Water Elisa Urbinati Cementing 11 May 2021 3
7in Magnum Composite BP Below 4-1/2" Tubing Delair Nazhat Drilling & Completion 08 October 2022 0
8RD vs Buttress Navin Singh Casing & Liners 11 May 2021 1
9 5/8" casing cement Ar Vi Cementing 11 May 2021 3