DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Running 8" motors in 8 1/2" holes Chris Henderson Drill String Design 11 May 2021 11
Drill 13 3/8" shoetrack with 8 1/2" drilling BHA Ronny Siregar Drilling Operations 11 May 2021 11
Abandonment cement plugs in 4-1/2" liner Kevin Stilwell Cementing 09 August 2021 11
Base-line caliper log for casing wear analysis Dave Taylor - SPREAD Moderator Casing & Liners 11 May 2021 11
Pilot-hole off a jack-up (daylight hours only ?) Dave Taylor - SPREAD Moderator Well Control 11 May 2021 11
Sidetrack with whipstock in 7in casing Chen Yuping Training and Competency 11 May 2021 11
Gas bubbles from dispersal valves 30/20″ casing annulus Unabaa Clinton Cementing 11 May 2021 11
18-5/8" X-56 & K-55, 87.5 lb/ft, BTC Are compatible Boas Kota Casing & Liners 11 May 2021 11
MS700 stuck wearbushing Ian Stapleton Subsea Engineering and Systems 11 May 2021 11
Use of ROD (Ream on Demand) to drill-out 20" casing shoetrack Dave Taylor - SPREAD Moderator DWOP Comments 11 May 2021 11
Annular Pressure (9 5/8" x 7") ZIANI Said Drilling Operations 11 May 2021 11
Kick with SICP Greater Than MAASP Elam Enoch Well Control 11 May 2021 11
Fishhook wells / Drilling uphill Lois de Crevoisier Drilling & Completion 11 May 2021 11
Strap-welding 36" bit Dave Taylor - SPREAD Moderator Drilling Operations 11 May 2021 11
Drilling into a nuclear explosion cavity Guillermo Rocco General discussions 11 May 2021 11
Scraper run before running liners Dave Taylor - SPREAD Moderator Casing & Liners 11 May 2021 11
Rig Inspection checklist Pulkit Goel General discussions 11 May 2021 11
13-3/8" x 13-5/8" Deep Casing Landing & BTC Connection Shah Kamal General discussions 11 May 2021 11
Is it necessary to run USIT with pressure applied to the casing/liner Dave Taylor - SPREAD Moderator Well Integrity 17 February 2022 11
Gate valve failure on the x-tree Sidi Yahia Berrouigat Well Control 13 December 2022 11