DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
BOP jet sub with integral swab cups (to stop debris falling down the well) Dave Taylor - SPREAD Moderator Milling 11 May 2021 12
OCTG Pipe Suppliers Gaz Rahchamani Casing & Liners 11 May 2021 12
API53S compliance Wullie Mair Well Control 11 May 2021 12
Subsea BOP Dropped Incidence by Rig Contractor - Lesson Learning Mahesh Picha DROPS 11 May 2021 12
Clearing the PGB of a large cement patio Warwick Sanderson Abandonments (facilities and/or wells) 11 May 2021 12
Should 'basic' questions be allowed on SPREAD? Scott McNeil General discussions 11 May 2021 12
Mud Ring David White General discussions 11 May 2021 12
PP&A onshore well, casing cutting depth Thiha Htoo Naung Abandonments (facilities and/or wells) 11 May 2021 12
Drift mandrel OD size used for 9-5/8" 53.5# casing Hideaki TSUKUI Casing & Liners 11 May 2021 12
Mudline Suspension System & TOC Challenge Shah Kamal Drilling Operations 14 February 2022 12
Secondary Retention on Temporary HP Cement Lines Harald Benning Cementing 17 February 2022 12
Drilling 6" hole ahead of 8-1/2" hole already drilled Syed Asad Abid Drilling Operations 28 June 2022 12
HIGH ANGLE WELL, CAVE INS AND HOLE PROBLEMS Charles Alhassan Drilling Operations 17 November 2022 12
Rigless Through Tubing Cement job Claudio Virgilio Cementing 19 October 2022 12
Balanced Cement Plug with string 5.5" DP inside 9 5/8" CSG 47 ppf Mohamed Abdellatif Cementing 21 April 2023 12
Directional Drilling BHA Harald Benning Drill String Design 11 May 2023 12
Running 8" motors in 8 1/2" holes Chris Henderson Drill String Design 11 May 2021 11
Drill 13 3/8" shoetrack with 8 1/2" drilling BHA Ronny Siregar Drilling Operations 11 May 2021 11
Abandonment cement plugs in 4-1/2" liner Kevin Stilwell Cementing 09 August 2021 11
Base-line caliper log for casing wear analysis Dave Taylor - SPREAD Moderator Casing & Liners 11 May 2021 11