DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Completions : Basis for Final Annulus Test Dave Taylor Completion 11 May 2021 1
Floatation fo Bunkering Hoses Doug Hodson HSE 11 May 2021 0
Completions : Chrome Tubing slipping thru slips Dave Taylor Completion 11 May 2021 7
Task Analysis: Drill Foor Ops David Brecknock Drilling Operations 11 May 2021 5
Land Rig Site Preparation - Ground Bearing Pressure Problem Davor Pavisa New Technologies 11 May 2021 1
Jar placement programs Chris Henderson Drilling Equipment 11 May 2021 3
Inflow testing a liner lap Graham Mackie Completion 11 May 2021 2
Avoiding man-riding for Surface Test Trees Dave Taylor Well Services 11 May 2021 4
Rig Personnel Requirements Dan Geary HTHP 11 May 2021 8
Electronic drifting of Tubulars Doug Hodson Casing & Liners 11 May 2021 2
(Deepwater) Well-testing with seawater in annulus Dave Taylor - SPREAD Moderator Well-testing 11 May 2021 3
BHA and Hydraulic optimization Muhammad Satrianus Drill String Design 11 May 2021 1
Changing DP size from 5″ to 5½ Dany Rizka Drill String Design 11 May 2021 10
Undereaming/Bi Center Bits Al Milne Drilling Equipment 11 May 2021 2
Sacrifice fluid (water) in PMCD HPHT Dany Rizka Underbalanced & Managed Pressure Drilling 11 May 2021 2
Running 7 5/8" Liner String on a spear Azam Zreik Drilling Operations 11 May 2021 0
Hydril PH6 Recommendations Scott Anderson Completion 11 May 2021 3
Buoyancy Assisted Casing Equipment Blake Wood Casing & Liners 11 May 2021 6
Moving Semi Sub at Deep Draft Dave Taylor Rig Specific & Surveys 11 May 2021 5
Well Control Odion Ikhajiagbe Well Control 11 May 2021 5