ALL DISCUSSIONS IN CEMENTING

1.Cementing Equipment 2.Cements 3.Displacement 4.Plugback 5.Single Stage 6.Two Stage - Running & Cementing Casing & Liners

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Experiences with bow centralisers on semi-flush Q-125 pipe Mike Nippard Cementing 11 May 2021 9
18-5/8" Subsea Release: Dual Plugs ? Dave Taylor - SPREAD Moderator Cementing 11 May 2021 9
Squeeze Cement Jane Susanta Cementing 11 May 2021 9
Green cement pressure test with stinger cementation Claudio Virgilio Cementing 11 May 2021 9
Reverse Cementing Vinod Mahadik Cementing 11 May 2021 9
Land-rig: Landing surface casing on 'H' beams to save WOC Dave Taylor - SPREAD Moderator Cementing 30 October 2021 9
Integrity of DV Collar Harald Benning Cementing 11 May 2021 10
Cemented Drill-In Structural Pilings for Floating Windfarm Anchors Steven Rosenberg Cementing 21 February 2023 10
Abandonment cement plugs in 4-1/2" liner Kevin Stilwell Cementing 09 August 2021 11
Time limits on pre-loading wiper darts Dave Taylor - SPREAD Moderator Cementing 11 May 2021 12
Rotating bow-spring centralizers Rufat Mammadbayli Cementing 11 May 2021 12
Gas bubbles from dispersal valves 30/20″ casing annulus Unabaa Clinton Cementing 11 May 2021 12
Cement 20" casing which is stuck in 26" open hole Yunchuan (Larry) Zhao Cementing 11 May 2021 12
Balanced Cement Plug with string 5.5" DP inside 9 5/8" CSG 47 ppf Mohamed Abdellatif Cementing 21 April 2023 12
Rigless Through Tubing Cement job Claudio Virgilio Cementing 19 October 2022 13
Cementing through Tesco Casing Running Tool Chris Schmickl Cementing 11 May 2021 14
Minimum Cumulative Cement length requirement Andrew Sutcliffe Cementing 04 April 2022 14
Secondary Retention on Temporary HP Cement Lines Harald Benning Cementing 17 February 2022 14
Tensile rating of NPT threads Wei Chian Ong Cementing 11 May 2021 15
Factors in Determining Shoe Track Length Jov Rodrigues Cementing 11 May 2021 16