ALL DISCUSSIONS IN DRILLING OPERATIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Extremely Abrasive formation & Losses Umair Ahmed Baig Drilling Operations 11 May 2021 16
Pumping alignment for Formation Integrity Test Andrea Atanes Drilling Operations 11 May 2021 2
Use of OBM for drilling of 8.5" laterals, approx. 10000 ft length from Offshore Jackup rigs_Risk involved Bhushan Salve Drilling Operations 11 May 2021 2
Connection Time Optimization Nurhendra Atmaja Drilling Operations 11 May 2021 0
DP11 Limitation (Dynamic Positioning system in AHTS Vessel) Benny Batubara Drilling Operations 11 May 2021 5
What should be the Standard / Benchmark Tripping speeds in Open hole and in Cased Hole, Casing running speeds for 2 million lbs Jack up rig , Vinod Mahadik Drilling Operations 11 May 2021 3
Drilling Equipment Surface System Pressure Loss Rates (Leak Rates) with Digital Gauges Robert Clyde Drilling Operations 11 May 2021 0
Directional Drilling Mode Saeed Vaezian Drilling Operations 11 May 2021 0
Drilling Ahead with auto-slips in place Dave Taylor - SPREAD Moderator Drilling Operations 11 May 2021 5
Large Diameter Borehole (2m dia.) Phil Lock Drilling Operations 11 May 2021 9
Avoidance of tracking original hole during cased-hole sidetrack Dave Taylor - SPREAD Moderator Drilling Operations 11 May 2021 0
Mud volcanoes Peter Aird Drilling Operations 11 May 2021 0
Open hole multilaterals Steve Devereux Drilling Operations 11 May 2021 3
Confidence in surveys Chris Henderson Drilling Operations 11 May 2021 4
Hematite in mud Chris Henderson Drilling Operations 11 May 2021 5
Who is responsible for ROP performance Baraket Mehri Drilling Operations 11 May 2021 6
Making losses even worse due to the surge of opening a circulating sub Dave Taylor - SPREAD Moderator Drilling Operations 11 May 2021 5
Drilling budget and cost public dataset Rodrigo Chiaradia Drilling Operations 11 May 2021 0
Tortuosity and String Weights Chris Henderson Drilling Operations 11 May 2021 4
Sub-sea BOP stack arrangement Thiha Htoo Naung Drilling Operations 11 May 2021 5