DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Directional Drilling BHA Harald Benning Drill String Design 11 May 2023 12
Gate valve failure on the x-tree Sidi Yahia Berrouigat Well Control 13 December 2022 11
NOV (Shaffer) Annulars Tom Macrae Subsea Engineering and Systems 28 June 2025 11
SPE certification Srinivas Bandaru Well Services 09 February 2023 11
Swellable packer as a well barrier Steve Nas Geo-thermal well specific 20 May 2024 11
Subsea Wellhead Retrieval Kaustubh Deshmukh Deepwater specific 17 August 2024 11
Scraper run before running liners Dave Taylor - SPREAD Moderator Casing & Liners 11 May 2021 11
13-3/8" x 13-5/8" Deep Casing Landing & BTC Connection Shah Kamal General discussions 11 May 2021 11
Is it necessary to run USIT with pressure applied to the casing/liner Dave Taylor - SPREAD Moderator Well Integrity 17 February 2022 11
Rig Inspection checklist Pulkit Goel General discussions 11 May 2021 11
MS700 stuck wearbushing Ian Stapleton Subsea Engineering and Systems 11 May 2021 11
Abandonment cement plugs in 4-1/2" liner Kevin Stilwell Cementing 09 August 2021 11
18-5/8" X-56 & K-55, 87.5 lb/ft, BTC Are compatible Boas Kota Casing & Liners 11 May 2021 11
Drill 13 3/8" shoetrack with 8 1/2" drilling BHA Ronny Siregar Drilling Operations 11 May 2021 11
Running 8" motors in 8 1/2" holes Chris Henderson Drill String Design 11 May 2021 11
Base-line caliper log for casing wear analysis Dave Taylor - SPREAD Moderator Casing & Liners 11 May 2021 11
Sidetrack with whipstock in 7in casing Chen Yuping Training and Competency 11 May 2021 11
Pilot-hole off a jack-up (daylight hours only ?) Dave Taylor - SPREAD Moderator Well Control 11 May 2021 11
Gas bubbles from dispersal valves 30/20″ casing annulus Unabaa Clinton Cementing 11 May 2021 11
Use of ROD (Ream on Demand) to drill-out 20" casing shoetrack Dave Taylor - SPREAD Moderator DWOP Comments 11 May 2021 11