DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Well control equipment :BOP stack position and Accumulator bottles position Sidi Yahia Berrouigat Well Control 08 August 2022 9
Gate valve failure on the x-tree Sidi Yahia Berrouigat Well Control 13 December 2022 11
Avoiding Stick Slip Simon Milne Drill String Design 11 May 2021 9
Use of surface and/or downhole debris screens Simon Shaw Drilling Operations 11 May 2021 10
Failed Liner Cement Job Simon Richards Drilling Operations 11 May 2021 9
BPMIGAS Operating Guidelines (PUPOP) Simon Shaw Jakarta Drilling Manager's Forum 11 May 2021 0
Abnormal Torque with increasing RPM upto 150 Sina Zamani Hole Problems 16 August 2021 9
DD-MWD-LWD Remote Operations Sinasi Eren General discussions 11 May 2021 7
Recompletion/workover in Openhole carbonate formation Siswara 'Dana' Suryadana Workover 11 May 2021 1
Apply torque in string when jarring down ? Soren Hartmann Stuck-pipe 11 May 2021 5
Preventing and removing hydrates at BOP wellhead or LMRP connector Soren Hartmann Deepwater specific 11 May 2021 7
How to measure, if "Identified Time Savings", i.e during a DWOP, actually have resulted in an "Actual Time Saving"? Soren Hartmann Performance 11 May 2021 5
Milling 4 1/2in production upwards with Coil Tubing Soren Hartmann P&A (Decommissioning) 18 June 2023 0
Completion Fluid for HT Condition Sri Khresno Completion 11 May 2021 3
SPE certification Srinivas Bandaru Well Services 09 February 2023 11
Wireline Platform for Floater Stefan Seyfried Well Services 11 May 2021 1
Pre drilled liner Stefan 't Hart Casing & Liners 11 May 2021 3
Screens with Internal Kill Slots Stefan Seyfried Completion 11 May 2021 5
Coiled tubing through Expandable Sand Screens Stefan 't Hart Coiled tubing (Wellservices) 11 May 2021 1
Real Data about the energy consumption in an offshore oil installation (drilling & accommodation facilities) Stelios Mili General discussions 11 May 2021 4