ALL DISCUSSIONS IN WELL CONTROL

1.Barrier Philosophy 2.Bullheading 3.Circulation Kill 4.Detection and Causes of Kicks 5.Relief Wells 6.Volumetric Kill 7.Well Bore Damage 8.Well Control Equipments 9.Well Control Methods 10.Well Integrity Issues

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Use of a Divertor in tophole off a jackup or platform Dave Taylor - SPREAD Moderator Well Control 11 May 2021 13
Pilot-hole off a jack-up (daylight hours only ?) Dave Taylor - SPREAD Moderator Well Control 11 May 2021 11
Running & inflating ECP in 'Significant Continual Loss' environment (Annulus Isolation) Dave Taylor - SPREAD Moderator Well Control 11 May 2021 4
Trapped pressure whilst testing BOP on stump Dave Taylor - SPREAD Moderator Well Control 11 May 2021 7
Well Control Equipment & Practices for infrequent wireline / slickline activities Dave Whitby Well Control 11 May 2021 0
BOP Elastomer Temperature Ratings (API 16A 3rd versus 4th edition) Dave Taylor Well Control 11 May 2021 0
Corrosion Log OPEN HOLE in a Perforated Gas Well Derek Munro Well Control 07 April 2022 13
BOP Removal Un Perforated Well Derek Munro Well Control 11 April 2023 10
Changes to Well Control Equipt, Practices, post Macondo Doug Hodson Well Control 11 May 2021 3
Kick with SICP Greater Than MAASP Elam Enoch Well Control 11 May 2021 11
Coriolis Meter Elisa Urbinati Well Control 11 May 2021 3
Well Control in H2S Environments Elman Mikayilov Well Control 11 May 2021 0
BOP pressure test times Eric Kipperman Well Control 11 May 2021 4
BOP Pressure Test Fabrizio Saavedra Well Control 11 May 2021 0
Shear Ram Configuration Gary Buyers Well Control 11 May 2021 5
Barite Plugs for Well Control Grant Lintern Well Control 11 May 2021 7
Should we consider Sub Surface Safety Valves as a Barrier? Heiko Fuchs Well Control 11 May 2021 16
Laws, Rules & Regulations on IWCF Requirments Heiko Fuchs Well Control 11 May 2021 5
Well Control Certification Himanshu Patel Well Control 11 May 2021 1
RAM Block Corrosion Huib Attema Well Control 11 May 2021 2