Unsure of selecting a group for placing your discussion? Post it under the General discussions and we will do the needful.
GROUPS
GROUPS | LAST POST | DISCUSSIONS | RESPONSES |
---|---|---|---|
SPREAD Updates (Hints and tips)
To ensure all users have a good understanding of how to use SPREAD |
Validating Membership | 26 | 67 |
Well-testing
Identify best practice in well-testing .. |
Eliminating the need for a Flex Trip (to check/clear tubing of debris) prior to (onshore) DST | 17 | 42 |
Jakarta Drilling Manager's Forum
To allow Drilling Managers in Jakarta to exchange information and store documents in an informal manner. |
BPMIGAS Operating Guidelines (PUPOP) | 1 | 0 |
Underbalanced & Managed Pressure Drilling
To bring together current opinions and experience |
mpd background gas | 18 | 57 |
HTHP
To supplement the various HTHP Forums that exist .. by providing adhoc discussion service Sub group(s)HTHP Forum UK |
Subsea BOP use from a HDJU on an HPHT well | 17 | 85 |
Casing & Liners
Matters relating specifically to casing and liners, including : centralisation, shoetracks, liner hangers, DV collars and so on. Includes wear-bushings and casing hangers Sub group(s)Drilling with casing Conductor Driving or Piling |
Offline make up and rack back 9-5/8", Run in stand with CRT | 108 | 470 |
Directional Surveying
To gather views and information on correcting the errors associated with current Directional Surveying practices. |
Stockhausen Effect | 16 | 75 |
Deepwater specific
Cover items specific to Deepwater activity |
Subsea Wellhead Retrieval | 60 | 249 |
Geo-thermal well specific
Discuss items of relevence to geo-thermal wells. General, industry-specific items should be entered into the "mainstream" groups. |
Swellable packer as a well barrier | 4 | 26 |
Recruitment
To allow rp-squared to earn revenue from this site, so we can keep it FREE to all members Sub group(s)UK North Sea |
Urgent need for a petroleum engineering job experience | 5 | 0 |
Abandonments (facilities and/or wells)
Facilitate discussions on best practice for permanent facility and/or well abandonment. Sub group(s)P&A (Decommissioning) |
Filming Location | 72 | 334 |
BLOG : Relentless Pursuit of Perfection
Promote the work that Relentless Pursuit of Perfection (rp-squared) are doing. This allows the members to appreciate what we can do. If you hire us, it allows us to make money at doing what we do best... and spread the vision. |
Hybrid-TWOP summary: Soon Digital DWOP | 33 | 36 |
Expandables
Promote discussion and knowledge sharing on expandables - incl. cement slurry design, use in HPHT wells etc., |
SET(Solid Expandable Tubular) in Ultra HPHT sections? | 1 | 1 |
RP-squared announcements
Promote rp-squared (and, in some way, recoup the cost of running this site) |
Additional measures to prevent unprofessional access to this site | 29 | 74 |
Novice's questions
The area to post Novice's questions. |
5 items to gather before Investigating things that go wrong? | 66 | 62 |
Due Diligence
To cover the areas of Assurance; Readiness to Drill Risk Assessments; HAZIDs/HAZOPS etc., |
While drilling gas levels - what are your limits, how are they managed? | 4 | 5 |
Logistics
Share best practice and understanding of logistics best practice |
National (Universal) Colour Code for Lifting Equipment | 5 | 28 |
Coal-Bed-Methane / Coal-Seam-Gas
Discuss the challenges associated with CBM/CSG. |
Well Bore Strengthening - Coal Seam Drilling | 9 | 4 |
Coiled Tubing Drilling
All aspect of coiled tubing |
Coiled Tubing Drilling surface setup | 10 | 6 |
Rig Move
All aspect associated with rig-moves. Onshore: From start R/D, til ready to go operational; incl. transportation (land, sea, air) Offshore: From start pull anchors til anchors pre-tensioned and ready to operate; includes tow |
OEM Stacking | 7 | 20 |