DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Directional Drilling BHA Harald Benning Drill String Design 11 May 2023 12
Workover on1980 well not able to flow oil to surface due to damage during completion Alex Williams Workover 07 May 2023 4
Near bit ejector unit 'NBEU' tool? Peter Aird Drilling Operations 07 May 2023 5
Install centralizers in 18-5/8” casing on pipe rack Mohamed Aboubakr Casing & Liners 03 May 2023 5
Annular preventer Marten Westink Well Control 04 May 2023 5
Coiled Tubing Cementing Edwin Damasena Cementing 24 April 2023 8
Old drilling mud and tubing impede progress Alex Williams Drilling Operations 04 May 2023 9
Offshore riserless drilling, massive sandstone intervals Peter Aird Hole Problems 01 June 2023 7
BOP Removal Un Perforated Well Derek Munro Well Control 11 April 2023 10
Balanced Cement Plug with string 5.5" DP inside 9 5/8" CSG 47 ppf Mohamed Abdellatif Cementing 21 April 2023 12
Wellhead Connector Glycol Injection Huib Attema Drilling Equipment 26 March 2023 3
Sacrificial Fiberglass Tubing Colin Hossack Cementing 22 March 2023 16
Highest mud weight Liqun Han Drilling Fluids 08 August 2023 7
Reamer vs Stabilizer vs Reaming Stabilizer Umair Ahmed Baig Drill String Design 19 March 2023 6
Advanced casing design (training) Peter Aird Casing & Liners 13 March 2023 3
9 5/8" Casing Flapper Valve Rene Rivard Drilling & Completion 05 March 2023 4
Cemented Drill-In Structural Pilings for Floating Windfarm Anchors Steven Rosenberg Cementing 21 February 2023 9
3 1/2" Inner String Run Inside 4 1/2" Tubing Andrew Hepburn Drilling & Completion 21 February 2023 5
Tieback for 30” conductors that have been cut at the seabed Reetum Chakraborty Completion 14 March 2023 5
API 16AR - Pressure Contact (Metal-to-Metal) Sealing Surfaces Pieter van Biljon General discussions 12 February 2023 0