DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Drilling Through a Fault Tayo Ajimoko Hole Problems 11 May 2021 9
Subsea BOP Reliability against NPT / New Technology to reduce NPT Mahesh Picha Well Control 11 May 2021 9
Abnormal Torque with increasing RPM upto 150 Sina Zamani Hole Problems 16 August 2021 9
Baghjan Well-5 Well Control Incident Abdul Mujeer Shaikh General discussions 11 May 2021 9
Experience with stabbing and M/U of 20" BTC connections on a semi-submersible Dave Taylor - SPREAD Moderator Casing & Liners 11 May 2021 9
P&A offshore wells Raed Mansour Abandonments (facilities and/or wells) 11 May 2021 9
Tubing pressure test Mohammed Ali Workover 11 May 2021 9
Land-rig: Landing surface casing on 'H' beams to save WOC Dave Taylor - SPREAD Moderator Cementing 30 October 2021 9
Cutting 9-5/8" with wireline-conveyed tools Dave Taylor - SPREAD Moderator Abandonments (facilities and/or wells) 26 October 2021 9
Pros and Cons of Shark Bite Dave Taylor - SPREAD Moderator Casing & Liners 15 January 2022 9
Well control equipment :BOP stack position and Accumulator bottles position Sidi Yahia Berrouigat Well Control 08 August 2022 9
Directional Driling Software Enrico Biscaro Drill String Design 28 October 2023 9
Top Filling Drill Pipe Dustin Dorsett Drilling Operations 24 December 2022 9
Characterizing Casing ID from Within Tubing Neil Deeney Abandonments (facilities and/or wells) 09 January 2023 9
NOV (Shaffer) Annulars Tom Macrae Subsea Engineering and Systems 04 April 2023 9
0psi SPP/3bpm - through tubing motor clean out BHA. Maher Sahmi Workover 15 January 2023 9
Cemented Drill-In Structural Pilings for Floating Windfarm Anchors Steven Rosenberg Cementing 21 February 2023 9
Old drilling mud and tubing impede progress Alex Williams Drilling Operations 04 May 2023 9
Failure of wireline logging (CBL/VDL) for 13"3/8 surface casing at a depth of 272 meters ZERTI ABDERRAHMEN General discussions 12 March 2024 9
Swellable packer as a well barrier Steve Nas Geo-thermal well specific 30 April 2024 9